Author: EVCOME-EV Chargers Manufacturers
Which is better, 60kw or 120kw charging pile? Which one is better, 60kw or 120kw, depends on the model being charged. Because the charging current that each model can accept is different, that is to say, the required power to be accepted is also different. For example, a new energy vehicle with a maximum required charging power of 60kw is charged on a 120kw charging pile, and the actual charging power is only 60kw at most. Therefore, when purchasing a charging pile, it is necessary to choose a charging pile suitable for the vehicle model, which can also effectively reduce costs. The charging pile 60kw means that the rated electric power of the charging pile is 60kw, and the maximum charging is 60 degrees in one hour; the charging pile 120kw means that the rated electric power of the charging pile is 120kw, and the maximum charging is 120 degrees in one hour. Some conventional safety protection issues of the charging pile 60kw120kw are: 1. The charging pile must reach the protection level of IP54, which can effectively resist normal rainfall and have no effect on vehicle charging. 2. The charging interface is designed with rubber sealing rings and water holes to ensure good water resistance and sealing, and to ensure that there will be no rainwater flowing into the vehicle being charged in rainy days. 3. During the construction of charging facilities, ground hardening and foundation protection will be carried out at the bottom of the charging facilities, so that the 20-30cm below the charging pile body has the ability to prevent flooding. 4. The design of the charging notch, insulator, monitoring port, etc. is also fully protected by electrical protection to ensure that there will be no charging safety accidents such as short circuits due to water immersion.
Recommend: