Self-use charging pile installation process Taking the 7kw self-use charging pile of Shenzhen evcome New Energy Co., Ltd. as an example, the installation process is as follows: 1. Before installation, please check whether the packing box contains the following items: 1. Wall-mounted AC charging pile 1 set/ 1 vertical AC charging pile 2. 2 test cards (whether with a card reader or not) 3. 1 installation manual 4. 1 certificate 5. 4 expansion screws 6. 1 wall bracket (wall-mounted )/column (column type)/vertical without wall mount 2. Installation environment requirements 1. This series of AC charging piles are outdoor charging piles, meeting IP54 protection level 2. Please ensure that the ambient temperature is between -25°C and +50°C 3. , Installation method This series of AC charging piles can choose wall installation, column installation or vertical installation according to the needs. You can choose the bracket produced by our company, and install it according to the following steps: 1. Make a cement base, pre-install 4 bolts on the cement base, and pre-install the charging pile inlet line at the center of the base 2. After the cement base is completed, put The pre-embedded charging pile inlet line passes through the bracket base, tighten the bracket base screws, and fix the bracket base on the cement base , fix the upper and lower parts of the bracket 4. Installation instructions 1. It is recommended to design the height of the building foundation≥1200mm2, it is recommended to design the specification of anchor bolts as M6×40 or M6×603. It is recommended to design the cross-sectional area of the external multi-strand copper core cable≥2X6mm2 If you want to know more details“Self-use charging pile installation process”, You can directly call 15919794865 to consult Shenzhen evcome New Energy Co., Ltd.! .
Recommend: